With rising electricity bills and frequent tariff hikes, solar net metering in Pakistan has become one of the smartest ways to reduce energy costs. Net metering allows solar users to export excess electricity to the national grid and receive credits in return.
If you’re wondering what solar net metering is in Pakistan?, how it works, and whether you’re eligible, this guide explains everything in simple terms – without technical confusion.
You may like to read;
How to Install Hybrid Solar System in Pakistan | A Comprehensive Guide
What is Solar Net Metering in Pakistan?
Solar net metering is a billing mechanism that allows solar system owners to;
✔ Use solar electricity during the day
✔ Export surplus units to the grid
✔ Import electricity at night or when needed
✔ Receive credits for exported units
A bi-directional (net) meter records both imported and exported electricity.
How Does Net Metering Work in Pakistan?
Here’s how the process works;
- Solar panels produce electricity
- Your home/business uses solar power first
- Extra units are exported to WAPDA/LESCO/K-Electric
- At night, electricity is imported from the grid
- Monthly bill adjusts exported vs imported units
📌 You only pay for net units consumed.
Who Can Apply for Solar Net Metering?
Net metering is available for;
✔ Residential homes
✔ Commercial buildings
✔ Industrial units
✔ Schools, hospitals & offices
Eligibility Requirements
- Minimum 1 kW solar system
- Valid electricity connection
- Grid-compliant inverter
- 3-phase meter (recommended)
- Proper safety & earthing setup
Once you have finalized the kind of solar system to be installed, you need to apply for the net metering approval and allocation in order to save time and energy cost.
Benefits of Solar Net Metering in Pakistan
✔ Up to 70–90% reduction in electricity bills
✔ Faster return on investment
✔ Legal export of surplus energy
✔ Environment-friendly energy use
✔ Increased property value
✔ Protection against tariff hikes
Net Metering Regulations in Pakistan
Net metering is regulated by NEPRA and implemented by DISCOs such as;
- LESCO (Lahore)
- K-Electric (Karachi)
- IESCO, GEPCO, FESCO, MEPCO
Key Rules
- Exported units are credited monthly
- Billing is done in PKR
- System size approved as per load
- Grid protection compliance mandatory
Step-by-Step Net Metering Application Process
Step 1: System Design & Installation
Install a net-meter compatible on-grid or hybrid system.
Step 2: Application Submission
Submit required documents to DISCO.
Step 3: Technical Inspection
Utility inspects wiring, inverter & safety systems.
Step 4: Meter Replacement
The old meter was replaced with bi-directional meter.
Step 5: Net Meter Activation
The system is officially approved for energy export.
⏱️ Average approval time: 4–8 weeks.
Documents Required for Net Metering
- CNIC copy
- Latest electricity bill
- Ownership documents
- Single-line diagram (SLD)
- Inverter & panel specifications
- Application forms
📌 Premier Solar Solutions handles complete documentation.
On-Grid vs Hybrid Systems for Net Metering
| Feature | On-Grid | Hybrid |
| Net Metering | ✅ | ✅ |
| Backup Power | ❌ | ✅ |
| Batteries | ❌ | Optional |
| Cost | Lower | Higher |
Please note: It is mandatory to install net meter or green meter for on-grid or grid-tied solar systems in order to ensure transparent flow of electricity produced, consumed, and exported.
Common Net Metering Myths
❌ Net metering is illegal
❌ Exported units are wasted
❌ Approval is impossible
❌ Solar damages the grid
✔ All are false when installed professionally.
Why Choose Premier Solar Solutions for Net Metering?
As a Lahore-based solar company, we offer;
✔ Net-meter compliant system design
✔ Approved inverter brands
✔ Professional installation
✔ Complete DISCO coordination
✔ Residential, commercial & industrial expertise
✔ After-installation support
Frequently Asked Questions (FAQs)
Q1: Is solar net metering allowed in Pakistan?
Yes, approved by NEPRA.
Q2: How much can I save with net metering?
Up to 90% of electricity costs.
Q3: Do I need batteries for net metering?
No, batteries are not required.
Q4: How long does approval take?
Usually 4–8 weeks.
Q5: Does Premier Solar Solutions provide net metering services?
Yes, end-to-end handling.
Final Thoughts
Solar net metering in Pakistan is one of the most effective ways to control electricity costs while contributing to clean energy. With proper system design and professional handling, the process is smooth and rewarding.